top of page


Breaking Ground: Phase 2 Officially Underway
October 2025 Willemstad - Phase 2 has officially begun. Groundwork has started, with the first excavation and preparatory work for the seven new villas at EPIC at the Bay, located at beautiful Piscadera. Step by step, the site is being prepared to transform this piece of land into an exclusive residential location.


We are officially topped off at EPIC at the Bay!
July 2025 Willemstad - We are excited to pronounce that all the rooftops are in place. The exterior is now complete. Let's move on to the inside!


Site cleaning
May 2022 Willemstad - Site cleanup has begun. Waste has been cleared and soon the digging of the terrain will begin. EPIC will be built on the most beautiful spot of Piscadera. Overlooking the beautiful Piscadera Bay and the Caribbean Sea. Below we share with your some pictures of the location and views:


The drawings are final!
January 2022 Willemstad - The sketches are drawn and the construction plans for this great project are ready. In a little while, we will...
bottom of page